Polymetal has completed the divestment of its Russian business on 7 March 2024. Please see the relevant announcement at the link. Operating and financial results as well as other information on this website until 7 March 2024 represent the Group in its former organizational structure, i.e. including Russian business, unless otherwise stated.

11 October 2017

Polymetal International plc (LSE, MOEX: POLY; ADR: AUCOY) (together with its subsidiaries – “Polymetal”, the “Company”, or the “Group”) is pleased to report a significant increase in Ore Reserves at the Komar gold deposit in Kazakhstan.

The updated reserve estimate was prepared under 2012 JORC standards and incorporates data from 387 diamond drill holes completed after Polymetal had agreed to acquire the asset in Q2 2016. In total, the exploration campaign comprised of 68,016 m of diamond drilling.

As a result, reserves have grown by 535 Koz of gold while the grade remained stable at 1.8 g/t. Most of the additional ounces represent an upgrade and conversion of inferred resources in the southern part of the property, as well as new mineralised material discovered along strike in the extreme northern part of the 5km-long deposit. The re-designed open pit has a stripping ratio of 13 mt/mt, roughly at the same level as the previously designed open pit. The maximum mining depth remained unchanged at 190 m below the surface level. Mineralisation is open along strike in the northerly direction and down-dip in the southern part of the deposit.

Polymetal now plans to mine, transport by rail and process approximately 2 Mt of Komar ore per year at the Varvara processing plant. This compares with the 1 Mt per annum ore production rate envisaged at the time of the acquisition. During the first 9 months of 2017, 1.4 Mt of Komar ore was processed at Varvara. The additional Komar ore will displace the lower-grade material from the Varvara deposit and consequently, increase production and result in lower costs at the Varvara processing hub. Mine-to-mill transportation costs for Komar ore are low and comprise approximately US$4.5 per tonne. This makes processing Komar ore at the existing plant at Varvara a superior option compared to the construction of a new on-site processing facility in terms of return on invested capital (ROIC).

Total upgraded Ore Reserves are estimated as at 1 June 2017 at 24 Mt of ore with a grade of 1.8 g/t for 1.4 Moz of gold contained. This represents a significant increase over the previous estimate with a 60% increase in tonnage and a 57% increase in gold content, further extending the Varvara hub mine life by 3 years, until 2032.

Komar Ore Reserves

Ore reserves Category 01.01.2017  01.06.2017 Change, %
   Tonnage, Kt  2,030  4,660  +130%
 Proved  Au grade, g/t  1.1  1.6  +45%
   Au content, Koz  74  236  +218%
         
   Tonnage, Kt  12,970  19,390  +49%
 Probable  Au grade, g/t  1.9  1.8  -5%
   Au content, Koz  799  1,138  +42%
         
Tonnage, Kt 15,000 24,050 +60%
Proved + Probable Au grade, g/t 1.8 1.8 0%
Au content, Koz 873 1,374 +57%

Notes: Ore Reserve estimate using Au= US$1,200/oz price. Ore Reserves are reported in accordance with the JORC Code (2012). Discrepancies in calculations are due to rounding.

Ore Reserve reconciliation, Koz of gold

 Ore Reserves, 01.01.2017  Depletion  Revaluation Ore Reserves, 01.06.2017
 873  -35  535  1,374

“We are very happy about the positive exploration results at Komar. The reserve expansion, increased processing capacity and associated economies of scale have far outstripped our expectations at the time of the acquisition. Polymetal plans to continue exploration at Komar with the goal to further extend the life-of-mine of the Varvara hub”, said Vitaly Nesis, Group CEO of Polymetal.

Back to press releases

You are downloading Integrated Annual Report . Please note that some ESG data are available in Sustainability Performance Data 2021 (GRI and SASB) that outlines our key non‑financial performance information for financial year 2021. While the selected annual report is being downloaded, we want to draw your attention to the Sustainability Report. It provides detailed information on ESG indicators.

While the selected files are being downloaded, we want to draw your attention to the reports on the sustainable development of the company. They provide detailed information on ESG indicators.

You can also download historical data on sustainable development.

2019