Polymetal has completed the divestment of its Russian business on 7 March 2024. Please see the relevant announcement at the link. Operating and financial results as well as other information on this website until 7 March 2024 represent the Group in its former organizational structure, i.e. including Russian business, unless otherwise stated.

9 November 2020

Polymetal announces a 25% increase in Ore Reserves at Kyzyl to 10.3 Moz of gold following initial reserve estimate at East Bakyrchik of 2.2 Moz of gold.

“A substantial reserve addition at East Bakyrchik extends the life-of-mine at Kyzyl to 30 years”, said Vitaly Nesis, Group CEO of Polymetal. “Importantly, open-pit mining will now continue till 2036”.

HIGHLIGHTS

  • The initial JORC-compliant Ore Reserve estimate for East Bakyrchik (Zone 2 of Kyzyl) as at 1 April 2020 comprises 18.8 Mt of ore at an average grade of 3.7 g/t containing 2.2 Moz of gold, roughly 80% of which are underground.

  • Total Kyzyl Ore Reserves now stand at 59.3 Mt of ore with an average grade of 5.4 g/t containing 10.3 Moz of gold. This represents a 25% increase compared with the estimate at the end of 2019.

  • Open-pit reserves increased by 9% to 4.3 Moz of gold contained at an average grade of 4.9 g/t, underground reserves were up 40% to 6.0 Moz at an average grade of 5.8 g/t.

  • East Bakyrchik has added 5 years to the total Kyzyl life of mine (2050), while life-of-mine (LOM) for the open pit has extended by 6 years (to 2036). East Bakyrchik open-pit LOM average strip ratio is 27 t/t.

  • The new mining schedule assumes an increase in the capacity of the Kyzyl processing plant from 2.0 Mtpa to 2.2 Mtpa in 2022.

  • East Bakyrchik Ore Reserve estimate incorporates data from the exploration campaign in 2015-2020 including 29.9 km of drilling (168 diamond drill holes).

  • Total Kyzyl Mineral Resources (additional to Ore Reserves) amount to 15.6 Mt of ore with an average grade of 4.0 g/t representing 2.0 Moz of gold contained.

Ore Reserves (Proved + Probable) changes

Ore Reserves

Category

01.01.2020
(Bakyrchik)

01.04.2020
(Bakyrchik &

East Bakyrchik)

Change, %

Open pit1

Tonnage, Mt

21.8

27.3

+25%

Au grade, g/t

5.7

4.9

-13%

Au content, Moz

4.0

4.3

+9%

 

 

 

 

 

Underground

Tonnage, Mt

18.8

32.1

+71%

Au grade, g/t

7.1

5.8

-18%

Au content, Moz

4.3

6.0

+40%

 

 

 

 

 

Total

Tonnage, Mt

40.6

59.3

+46%

Au grade, g/t

6.3

5.4

-15%

Au content, Moz

8.2

10.3

+25%

Notes:
(1) Including stockpiles

ORE RESERVES

The Ore Reserve estimate is reported in accordance with the JORC Code (2012) and was prepared by Polymetal using a gold price of US$ 1,200/oz. For the Bakyrchik open pit and underground the previous estimate was performed as at 1 July 2019, the updated estimate was prepared as at 1 April 2020 and accounts for the pit extension and depletion. A cut-off grade of 0.8 g/t of gold was applied for the open pit and 3.0 g/t for the underground. East Bakyrchik initial Ore Reserve estimate was performed as at 1 April 2020. A cut-off grade for recovered gold of 0.6 g/t was applied for the open pit and 2.0 g/t for the underground, the reserves were estimated on the basis of variable recovery value for each of the blocks generated.

Kyzyl Ore Reserve estimate

Ore Reserves

Tonnage,

Gold grade,

Gold content,

Mt

g/t

Moz

Proved

 

 

 

Open-pit (Bakyrchik)

1.4

7.4

0.3

Stockpiles

0.4

5.2

0.1

Total Proved

1.8

6.9

0.4

 

 

 

 

Probable

 

 

 

Open-pit

25.5

4.8

3.9

Bakyrchik

20.4

5.3

3.5

East Bakyrchik

5.0

2.6

0.4

Underground

32.1

5.8

6.0

Bakyrchik

18.4

7.1

4.2

East Bakyrchik

13.7

4.1

1.8

Total Probable

57.5

5.3

9.9

 

 

 

 

Proved + Probable

 

 

 

Open-pit

26.9

4.9

4.2

Bakyrchik

21.8

5.4

3.8

East Bakyrchik

5.0

2.6

0.4

Underground

32.1

5.8

6.0

Bakyrchik

18.4

7.1

4.2

East Bakyrchik

13.7

4.1

1.8

Stockpiles

0.4

5.2

0.1

Total Proved+Probable

59.3

5.4

10.3

Notes: discrepancies in calculations are due to rounding

 

MINERAL RESOURCES

The Mineral Resources estimate is reported in accordance with the JORC Code (2012) and was prepared by Polymetal using a gold price of US$ 1,200/oz. For the Bakyrchik open pit and underground the previous estimate was performed as at 1 July 2019, the updated estimate was prepared as at 1 April 2020 and accounts for the pit extension and depletion. Cut-off grades of 0.8 g/t and 3.0 g/t of gold were applied for the open and the underground, respectively. East Bakyrchik updated Mineral Resource estimate was performed as at 1 April 2020. A cut-off grade for recovered gold of 0.6 g/t was applied for the open pit and 2.0 g/t for the underground, the resources were estimated on the basis of variable recovery for each of the blocks generated. The Mineral Resource estimate for Bolshevik was prepared by Polymetal as at 1 January 2019, revised estimate was not performed due to lack of material changes. Cut-off grades for the open pit and the underground are 1.0 g/t and 3.3 g/t of gold, respectively.

Kyzyl Additional Mineral Resource estimate

Mineral Resources (additional to Ore Reserves)

Tonnage,

Gold grade,

Gold content,

Mt

g/t

Moz

Measured

Open-pit (Bakyrchik)

0.0

2.5

0.003

Total Measured

0.0

2.5

0.003

 

 

 

 

Indicated

Open-pit

1.8

2.2

0.1

Bakyrchik

0.7

2.2

0.1

East Bakyrchik

0.4

1.2

0.0

Bolshevik

0.7

2.9

0.1

Underground

5.0

4.5

0.7

Bakyrchik

2.1

4.8

0.3

East Bakyrchik

2.5

4.0

0.3

Bolshevik

0.4

6.4

0.1

Total Indicated

6.8

3.9

0.9

 

 

 

 

Measured + Indicated

 

 

 

Open-pit

1.9

2.2

0.1

Bakyrchik

0.8

2.2

0.1

East Bakyrchik

0.4

1.2

0.0

Bolshevik

0.7

2.9

0.1

Underground

5.0

4.5

0.7

Bakyrchik

2.1

4.8

0.3

East Bakyrchik

2.5

4.0

0.3

Bolshevik

0.4

6.4

0.1

Total Measured + Indicated

6.8

3.9

0.9

 

 

 

 

Inferred

 

 

 

Open-pit

3.9

2.3

0.3

Bakyrchik

0.4

2.0

0.02

Bolshevik

3.5

2.3

0.3

Underground

4.9

5.6

0.9

Bakyrchik

2.4

6.4

0.5

East Bakyrchik

0.6

3.7

0.1

Bolshevik

1.9

5.2

0.3

Total Inferred

8.7

4.1

1.2

 

Measured + Indicated + Inferred

 

 

 

Open-pit

5.7

2.3

0.4

Bakyrchik

1.2

2.1

0.1

East Bakyrchik

0.4

1.2

0.02

Bolshevik

4.2

2.4

0.3

Underground

9.8

5.1

1.6

Bakyrchik

4.5

5.7

0.8

East Bakyrchik

3.1

4.0

0.4

Bolshevik

2.2

5.4

0.4

Total Measured + Indicated + Inferred

15.6

4.0

2.0

Notes: discrepancies in calculations are due to rounding.

COMPETENT PERSONS

This estimate was prepared by employees of JSC Polymetal Management Company, JSC Polymetal Engineering and subsidiaries of the Company, led by Mr. Valery Tsyplakov.

Mr. Tsyplakov is employed full-time as the Managing Director of JSC Polymetal Engineering and has 19 years’ experience in gold, silver and polymetallic mining. Being a Fellow of the Institute of Materials, Minerals & Mining (FIMMM), London, he is a Competent Person under the JORC Code.

Listed below are other Competent Persons employed by the Company that are responsible for relevant research on which the Mineral Resources and Ore Reserves estimate is based:

  • Geology and Mineral Resources – Victor Pchelka, Head of Production and Geology Department, Polymetal Eurasia, PONEN, MIMMM, with 34 years’ relevant experience;

  • Mining and Ore Reserves: Open Pit Bakyrchik – Anton Ignatov, Chief Specialist for Open-pit Mining, Technical Department, Polymetal Management Company, MIMMM, with 17 years’ relevant experience; Open Pit East Bakyrchik – Dmitriy Teterin, Head of Mineral Resources and Ore Reserves Audit Department, Polymetal Engineering, FIMMM, with 11 years’ relevant experience; Underground – Andrei Somov, Head of underground mining Department, Polymetal Engineering, PONEN, FIMMM, with 32 years’ relevant experience;

  • Concentration and Metals – Igor Agapov, Director of Science and Technology Department, Polymetal Engineering, MIMMM, with 22 years’ relevant experience;

  • Mineral Resources, Bolshevik – Alexander Cherepanov, Lead Geologist, Prospecting and Exploration Department, Polymetal Management Company, MIMMM, with 27 years’ relevant experience.

All the above-mentioned Competent Persons have sufficient experience that is relevant to the style of mineralisation and types of deposits under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code).

All Competent Persons have given their consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.

Back to press releases

Download release PDF (276 KB) Re-domiciliation Q&A
Investor Relations Contacts

Tel. +44.20.7887.1475

Evgeny Monakhov

Tel. +7.7172.476.655

Kirill Kuznetsov
Send mail

You are downloading Integrated Annual Report . Please note that some ESG data are available in Sustainability Performance Data 2021 (GRI and SASB) that outlines our key non‑financial performance information for financial year 2021. While the selected annual report is being downloaded, we want to draw your attention to the Sustainability Report. It provides detailed information on ESG indicators.

While the selected files are being downloaded, we want to draw your attention to the reports on the sustainable development of the company. They provide detailed information on ESG indicators.

You can also download historical data on sustainable development.

2019